Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

If cosB =3/5, what is tanB?
Find the slope, as a decimal number, of the line that passes through the points (-1,7) and (-3,6)
Steroids can decrease an athlete's ability to perform by causing injuries that are difficult to recover from. This happens because steroids don't foster overall
Which factor plays the largest role in economic decisions in a command economy?
A square is cut into 9 smaller squares where each is similar to the original of which 5 are then colored blue. Each of the remaining uncolored squares are cut i
by 1963, which of the following had not been achieved by the civil rights movement
Find the value of this expression if x = 5. x^2+7 / x-7
According to the information in the article, could the increase in algae in the neighborhood lake be related to Sarah’s farm? Why or why not?
What are all of the populations living in an ecosystem called? What are the non-living parts of an ecosystem called? What is made up of all of the members of
What president help create greater prosperity of the 1920s wealth in America