teetee7079 teetee7079
  • 02-09-2019
  • Engineering
contestada

Explain the process of predicting equipment failure?

Respuesta :

Numenius
Numenius Numenius
  • 11-09-2019

Answer:

The predicting equipment failure is the process that does not require any data or information from the equipment. The main aim of the predictive maintenance is the ability to find the system failure firstly and then prevent the equipment.

We can easily predict the equipment failure by proper monitoring and controlling the whole system. Then, find all the defects and analysis the problem in the equipment so that we can prevent it efficiently without any occurrence of interrupt in the equipment.

Answer Link

Otras preguntas

Compare the various effects that alcohol has on the mind and body at two different blood alcohol concentrations.
What is the HCF of 2 x y and 6 x y?
Baker university hired its first coachj in?
Solve the simultaneous equations 2x+3y=-3 3x-2y=28
1. What are the next three terms in the sequence?-1 ,9 ,19 ,29 . . .A. 38, 37, 32B. 40, 51, 62C. 39, 49 , 59D. 38, 47, 562. What are the next three terms of the
estimate for 412*5.904/0.195any one knw the estimate for this and how to work it out
plz tell me what is dry ice?
if a baking tray is 700mm by 600mm, how many of 25cm in diameter can fit into the baking tray?
estimate for 412*5.904/0.195any one knw the estimate for this and how to work it out
If an ant runs randomly through an enclosed circular field of radius 2 feet with an inner circle of radius 1 foot, what is the probability that the ant will be