lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

Which of the following can be found on a prescription label? a. warnings b. ingredients c. types of symptoms it treats d. how often you should take the medi
Greek fire was used by the
Persian rulers divided their vast empire into smaller regions ruled by loyal _____. A. serfs B. satraps C. citizens D. philosophers
Bob and Alice have a mortgage for $73,280. If the mortgage is set at 7 percent for 30 years, how much is their monthly payment if their rate is 6.75 per 1,000?
To make dough Reba needs 2 1/2 cups of flour how much flour does she need to make 5 batches of dough
I'd d = rat and if r = 60 and t = 4, what does d equal?
At the time of the Civil War, the South could be described as urban and the North as pastoral.  true false
bianca vargas navarro
Find the distance, to the nearest tenth, from T(4-2) to U(-2,3)
What questions about postwar Europe did the allies face