​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Round 673,422 to the nearest hundred.
what was the impact that the battle of fort ticonderoga had on the American soldiers?​
Which of the following does NOT apply to the Anglican Church? A.The church favored simple ceremonies and rituals. B. The king controlled the church. C. People w
Raoul’s teacher asked him to take a survey about his activities. She didn’t understand his French very well—help her out by completing his list. 1. Je__________
ILL GIVE YOU BRAINLIST which definition does unalienable mean !!
Is mowing the lawn a physical change or a chemical change?
3.7m∧5÷3.7m∧2 How do I complete this expression?
Hi can some one help me with all of them plz this is due tomorrow plzzzzzzzzzzzzzzzzzzzzzzzzz​​​
The bottom number of a time signature shows how many beats there are per measure. True False
All of the following crops are grown in the North Central Plains except: a. fruits b. coffee C. peanuts d. vegetables