adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

Mendel's work was accomplished at about the same time evolution was proposed by
Which of the following describes an atom
how did the marshall plan strengthen containment foreign policy agenda
solve 3sinx-4sin^3 x= -1
How do you convert 56 kilometers to inches
What does William Wordsworth compare the daffodils to in the following lines? When all at once I saw a crowd, A host, of golden daffodils; a. A small collect
Which statement accurately describes how identification of individuals through the use of genetic engineering is possible? A. The Y chromosome doesn't experien
Presidents facing opposition to key policies or legislative positions will often: A. deny party campaign funds to members opposing the bill. B. cite opinion pol
Why are paintings from medieval times more generic, lacking individual qualities? a. virtually all medieval paintings were produced by monks. b. the church frow
Three times a number is no less than negative six.