toniaotieno
toniaotieno toniaotieno
  • 02-01-2021
  • Mathematics
contestada

how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

Does the depth of a pan affect how water freezes?
Rewrite the function c(x) =9(x+3) using the distributive property
What is a direct combination reaction?
How many minutes are in 36 hours?
Can u paraphrase the quote ”let things take their course”
You have a cylinder with a diameter of 15 inches and a height of 12 inches. What is the volume of the largest sphere thg will fit inside it? If you can will you
Was the Gold Rush a good or bad thing for the United States?
is it possible for a distance versus-time graph to be a vertical line?
What is two thirds minus six thirds
If the speed of an object is tripled, its kinetic energy will be