What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

whats the difference compares a hypothesis and a theory?
Temperatures in this climate region stay about the same all year long. continental moderate tropical tundra
Who united the two kingdoms of Egypt?
how you write 102,453 in expanded form
how to round in math im confused
The digitization of books has : A . cause people to burn their physical books B. Made reading less appealing to the public C. Brought books that were out of
name the 4 classes of macromolecules and give a function for each
The wingspan of a small plane is 7 meters. If there are approximately 3.28 feet in one meter, what is the wingspan of the plane in feet? Round your answer to th
Which of the following would happen to the moon if gravity no longer affected it?
Lily read 72 pages on sunday and 83 pages Monday about how many pages did Lily read during the two days