It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

Which type of joints is found between the lower jaw and skull
Why did European Colonists bring enslaved Africans to thereplantations in the Americas?​
Find the given limit. If the limit does not exist, put "D​
A 2 year old could answer this.
What direction does water and the flows during countercurrent flows
A car dealership sold 156 cars in 3 months at what rate did the dealership sell cars per month
simplify the expression 7.8n²+0.5+9n-.0.4-7n+n²​
This is a policy by the Federal Reserve to reduce the money supply and slow down economicactivity, mainly by raising interest rates, selling securities, and/or
4.) The DNA sequence above is found on a chromosome in a eukaryotic cell. The cell is allowed to undergo DNA replication and mitosis in a solution containing r
The assignment for this lesson is to write a humorous narrative. Your story can be about an event that happened in real life, or it can be totally fictional. Ei