medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

grap f(x)=x^2+1/3(x-8)
Nitric oxide reacts with chlorine gas according to the reaction: 2 NO( g) + Cl2( g) ∆ 2 NOCl( g) Kp = 0.27 at 700 K A reaction mixture initially contains equal
Which of the following statements best describes a valuation allowance as it relates to accounting for income taxes? A. A valuation allowance is a contra accoun
liquid, fresh water percentage
According to Aristotle, democracies that do not follow the rule of law can fall victim to?
Fill the blank with the preterite tense of the verb in parentheses. Nosotros no _________________ a las nueve. (empezar) Change this verb from the present ten
Metal Specific Heat Copper 0.385 J/(g°C) Magnesium 1.02 J/(g°C) Iron 0.450 J/(g°C) Silver 0.237 J/(g°C) Lead 0.127 J/(g°C) If the same amount of heat is added t
Jim is an appliance salesperson. To make a sale, he asserts that a certain model of a Kitchen Helper refrigerator is the “best one ever made.” This is​ a. ​frau
PLEASE HELP!!! HURRY EMERGENCY !! 50 PTS AND BRAINLIEST Create a graph of the combined function h(x) = f(x) + g(x) in which f(x) = x - 6 and g(x) = x + 6. On y
Kali runs 10 laps around a track each day. each lap around the is 400 meters. how many days will it take kali to run a total of 12 kilometers.