ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

what is the solution of 12x-7
Can someone please help me
Mi amigo José de Uruguay tiene trece años. El apodo de José es Pepe. Él tiene los ojos verdes. Mi hermano pequeño se llama Jesús y tiene el apodo de Sito. Él es
Read the rough draft of a works cited page. Works Cited Gregor, Saul. Harnessing the Wind. Chicago: Skyline Publishing, 1998. Cayman, Felicia. The Windmill Way
What’s the surface area of the figure
I just need to know what x =
A rectangular room has a length 8m and breadth 4m.find area of the room
4x3 + 12x2 = 40x How to solve by factoring
A jet engine has ten components in series. The average reliability of each component is 0.998. What is the reliability of the engine? (Round your answer to 3 de
Do you think Africa's colonial history contributed to the rise of extremist groups like Al Shabab? Explain. ESSAY