Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

If a pea plant's genotype is Tt, what is its phenotype
How do i figure this problem out ? 2+3a+9a=
how does the biosphere rely on the other spheres for survival
Which statement best describes the composition of magma? a. Magma is an element all its own. b. Magma contains the same elements as snow. c. Magma contains o
How do you answer this question.
Which of the following is an example of a benefit of government involvement in the economy? A. government bans on necessary goods B. government regulation of mi
Which of the following best defines parallelism? a. the use of symbols and figures of speech b. the repetition of a grammatical structure or arrangement of wo
Jill is making lemonade. The original concentration was 25 mL of concentrate to 2 L of water. People found that too strong so she decreased the concentration t
What is the most probable reason that rhyme and repetition first found their ways into poems? a. They were written for the upper class. b. The poems were easi
Mr. Stevens drives 110 miles in 2 hours, 165 miles in 3 hours, and 220 miles in 4 hours. How many miles will he drive in 5 hours?