boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

List three bad things that Haden Edwards has done.
what is the theme in chapter 16 of the summer of the mariopsas
What is the domain of the function f(x) =sqrt 1/3x+2 ? (answers in picture)
Breaking difficult problems down into smaller more manageable pieces is an example of
Which of the following verbs should you use to say that you remember something? A. Devenir B. Revenir C. Convenir D. Se souvenir
Rhyme scheme is the pattern of rhyming lines in a poem. Question 1 options: True False
Find the Acceleration of a car with the mass of 1200kg and a force of 11x10^3 N
A packaging company is planning is in the planning stages of creating a box that include a three dimensional support inside the box.The box has a width of 5 fee
Wear Bars appear when the tread is down to what depth?
Rachel shared 50 peanuts equally among his 4 sisters. How many peanuts did Rachel have left after he gave his sisters their share?